Content Casino kayıt ve ilk para yatırma bonusları Canlı casino bahislerinden nasıl para kazanılır? İnternette büyük oranlar ve büyük kazançlar Slot makinelerinin mobil versiyonu Casino kayıt ve ilk para yatırma bonusları Yapılan incelemelerde, Hepsibahis bahis sitesinin kaliteli ve güvenilir sitelerden
Oct 2020

BILQUIS-MUSHAF GENERAL HOSPITAL ELECTRIFICATION PROJECT CONTENTS: Introduction. Overview. Interns. Problem Statements. Objective. Previous system details. Modified system details. Outcome. System Status Comparison. All modifications in the Hospital Electrification project. INTRODUCTION:Rashidabad Momerial Welfare Organisation is basically a welfare organisation Rashidabad Sindh,
Sept 2020
VOLTAGE CHARACTERISTICS OF RECHARGEABLE SOLAR BATTERIES SPECIFICATIONS OF THE BATTERY: Nominal voltage is 12 V 50% DoD Gel type Manufacture by JTE Rated capacity is 100 Ah Typical weight is about 33 Kg Maximum Charging Current Limit is 25 A
November, 2019
Report Prepared: 20th February’ 2020 Team Members: M. Hassaan Qadeer,Usman Ahmed,Urooj Fatima, Syeda Rimsha,Shanze Khan. TEAM ORPHANAGE Team Orphanage with its new interns was assigned a task to visit ‘Indus Hospital’ and ‘My Home Al-Mustafa Orphanage’ in order to get
October,2019
Installation Of Fronius System By Inverex 1. OBJECTIVE: To install Fronius symo 5.0-3-s grid tie inverter in RASHIDABAD existing solar project. 2. PROBLEM STATEMENT: During the planning stage of Rashidabad’s solar project the inverter was under sized because of which
September, 2019
BILQUIS MUSHAF HOSPITAL: RASHIDABAD SOLAR PROJECT Visit report VISIT DATE: 19TH OCTOBER 2019 OVERVIEW: On 19th October 2019, the team of interns from Sawayra working at Bilquis Mushaf Hospital, Rashidabad visited the project site to trouble shoot some major issues
August 2019
“AL MUSTAFA ORPHANAGE” -PROBLEMS FACED DURING INSTALLATION OF SOLAR PANELS Interns: SAAD SHAKIL HASSAAN QADEER UROOJ FATIMA PROJECT TITLE: Installation of 12.35kW Solar Power Plant PROBLEM STATEMENT: Technical/Civil problems faced at the time of installation DESCRIPTION: The key problems that
July 2019
Load Transition in Hospital INTRODUCTION: Before the installation of PV-System at Bilquis-Mushaf Hospital, in beginning months of 2017, it’s detailed planning and Data collection was taken off. Load calculation and estimation was a very crucial part of this analysis and
June 2019
INSTALLATION AND COMMISSIONING AT RASHIDABAD PROJECT IOTAWATT: ➢ Problem statement: OpticsRE has huge gaps recently which is probably due to internet outage and which results in data loss. ➢ Solution: In case of an internet outage, IotaWatt is programmed to